• #235. No.1349 Huaxiadonglu Road,
    Shanghai, China.

Projects

100 TPH Gold Ore Processing Plant in Egypt

Customer Background

Our client is a well-established gold mining company in Egypt, focused on extracting and processing gold ore for both local and international markets. With increasing demand for higher yields, they required a reliable, efficient, and cost-effective crushing and grinding solution to maximize gold recovery.

Project Overview

  • Location: Egypt
  • Material: Gold ore (hard rock)
  • Required Output: 100 tons per hour
  • Final Product: 0-10mm crushed ore for further grinding and cyanidation
100 TPH Gold Ore Processing Plant in Egypt

Challenges

  1. Hardness & Abrasiveness of Gold Ore – Requires durable and wear-resistant crushing equipment.
  2. Precise Crushing & Grinding – Need for finely crushed ore to optimize gold recovery.
  3. High Efficiency & Low Maintenance – Ensuring continuous operation in remote mining locations.
  4. Cost-Effective Setup – Minimizing energy consumption and operational costs.

Solution by Liming Heavy Industry

To meet the gold ore processing demands, we designed a complete crushing and grinding circuit using high-performance equipment:

1. Primary Crushing – PE750×1060 Jaw Crusher

  • Role: Coarse crushing of large gold ore rocks (≤630mm) into smaller chunks.
  • Advantages:
    • High crushing ratio for efficient size reduction.
    • Robust construction with reinforced jaw plates for long-lasting performance.
    • Energy-efficient motor reduces operational costs.

2. Secondary Crushing – HPT300 Hydraulic Cone Crusher

  • Role: Fine crushing of primary crushed ore into 0-40mm particles.
  • Advantages:
    • Multi-cylinder hydraulic design ensures stable output.
    • Adjustable discharge size for customized product control.
    • Low wear rate with high-quality manganese steel liners.

3. Grinding – Ф1830×4500 Ball Mill

  • Role: Fine grinding of crushed ore to 0-10mm for optimal gold recovery in cyanidation.
  • Advantages:
    • High grinding efficiency with controlled fineness.
    • Large capacity with minimal energy waste.
    • Durable lining & grinding media for extended service life.

4. Screening – 3YK2870 Vibrating Screen

  • Role: Classification of crushed and ground material into desired sizes.
  • Advantages:
    • Multi-layer screening for precise separation.
    • High-efficiency vibration ensures no clogging.
    • Minimal maintenance for continuous operation.

5. Supporting Equipment

  • Belt conveyors (B800, B1000) for seamless ore transportation.
  • Dust suppression system to meet environmental regulations.

Technical Highlights

  • Automated Control SystemPLC-based monitoring ensures smooth and efficient operation.
  • Energy-Efficient Design – Optimized circuits reduce power consumption.
  • Durable & Wear-Resistant – High-quality materials extend equipment lifespan.
  • Easy Maintenance & Setup – Designed for remote mining conditions.

Project Results

  • Achieved 100+ TPH – Exceeded production expectations.
  • Consistent Product Size0-10mm optimized for gold extraction.
  • High UptimeMinimal breakdowns due to robust machinery.
  • Lower Operating Costs – Reduced maintenance and energy usage.

Customer Feedback

“Liming Heavy Industry provided us with a high-efficiency gold ore processing plant that meets our production targets reliably. Their PE750×1060 Jaw Crusher and HPT300 Cone Crusher worked flawlessly, and the ball mill ensures perfect grinding for maximum recovery. We appreciate their technical expertise and excellent after-sales support.”
Mining Operations Manager, Egypt

Custom Crushing Solutions For All
Mining & Aggregates Needs

With 30+ years of expertise, we engineer crushing systems that maximize your productivity
while minimizing operational costs through smart, sustainable designs.
Get Your Free Solution Quote
Our Products

Key Equipment

KEEP IN TOUCH

Follow us to get the first time information.We will answer any questions.